Research, Development and Projects

PSI GridConnect keeps at it for its customers. We have been collecting and promoting smart grid know-how for many years.

This is how experience turns into success.

Flexgrid project logo

 

Practice-oriented implementation of a quota-based network traffic light concept for the use of flexibility - inside and from distribution networks.

Aims

     

  • market access for smaller producers or prosumers (P2P trade)
  • cost savings through C2C energy transactions (regional compensation)
  • detection of critical load situations in the grid area
  • enabling active network management plus network status forecast
Image of Map by flexgrid project

Benefits for Energy Transition

Project Findings

  • exploitation of unused potential in the network
  • transparency through traffic light systems
  • autonomous network management
  • support with complex control tasks by artificial intelligence

Additional information: Project Website R&D Contact

[Translate to English:] bmwk-svg

Project Partner

 

 

 

 

Integrated platform for peer-to-peer energy trading and active grid management (PEAK)

Aims

     

  • investigation and testing: The use of flexibility in distribution grids and provision of flexibility from distribution grids in support of upstream voltage levels
  • integration of the traffic light concept into grid control systems
  • testing of a decentralized, semi-autonomous network management for HV, MV and LV networks
  • extension of the control concept towards AI-based algorithms, providing multi-criteria control tasks and state estimation

Benefits for Energy Transition

Project Findings

  • integration of small/micro generators and loads
  • more efficient planning steps
  • real time grid optimization 
  • control of voltage

Additional information: Project website R&D Contact

[Translate to English:] bmwk-svg

Project Partner

 

Redispatch 3.0 – demonstration project "Redispatch" and marketing of small systems' flexible margins, 

revealed by intelligent measuring systems

Aims

     

  • organizational model for cascade and redispatch 3.0
  • incentive schemes for marketing of flexibilities
  • inclusion of small systems for flexibility calls in the redispatch process (iMSys, CLS, ...)
  • optimization in operational planning and management
  • cross-voltage level
  • real-time optimization
  • dynamic pooling of small systems
  • field test at EWE Netz GmbH and MVV Netze GmbH

Benefits for Energy Transition

Project Findings

  • integration of small systems
  • more efficient planning processes
  • grid optimization in real time
  • control of voltage level

Additional informationProject website R&D Contact

[Translate to English:] bmwk-svg

Project Partner

Questions so far?

Get in contact with us! Your questions and requirements are important to us: Via E-mail to  info@psigridconnect.de or by Phone  +49 721 94249 0.